Skip to content

8 Days Kilimanjaro Climb - Lemosho Route

Day 1: Lemosho Gate to Mti Mkumbwa (2,650 m/8,692 ft)

Hike time: 3hrs

Elevation Change: + 650 M/+2,132

Estimation distance: 10 km

Final Elevation: 2,650 m/8,694 ft

After a 1 1/2 hour drive from Moshi check in is at the Lemosho Gate. Day 1 is fairly easy with a 3/4 hour climb to Miti Mkubwa Camp.

Lemosho gate
Shira 1 Camp

Day 2: Mti Mkubwa (2,650 m/8,692 ft) to Shira One Camp (3,609 m/11,841 ft.)

Hike time: 5 – 6 hrs

Elevation change: + 950 M/+3116

Estimation distance: 12 km

Final Elevation: 3609 m/11,841 ft

A few hours walk will see the end of the forest and the beginning of a climb through heather forest to the edge of the Shira Caldera. Destination is the scenic Shira One Camp

Day 3: Shira One Camp (3,609 m/11,841 ft.) to Shira Two Camp (3,849 m/12,628 ft.)

Hike time: 5 – 6 hrs

Elevation change: + 240 M/+787 ft

Elevation distance: 5 km

Final elevation: 3849 m/12,628 ft

Today is spent on a gentle hike across the Shira Plateau with possible side trips to Shira Cathedral. Camp is at the first high camp of Shira Two.

NOTE: From Shira Two Camp the trail links with Machame Route.

6-days-kilimanjaro-climb-shira-route2
Barranco Camp

Day 4: Shira Two Camp (3,849 m/12,628 ft.) to Barranco Hut (3,948 m/12,956 ft.)

Hike time: 5 hrs

Elevation change: +100 M/+328 ft

Estimated distance: 6 km

Final elevation: 3948 m/12,956 ft

The real work of climbing Kilimanjaro begins here. Today the main feature is a slow climb to Lava Camp followed by a descent to the beautiful Barranco Camp. This is the Climb-High-Sleep-Low principal of altitude adjustment.

Day 6: Karanga Valley (3,963 m/13,000 ft) to Barafu Hut (4,600 m/15,091 ft)

Hike time: 3.5 hrs

Elevation change: +600 m/+1,968 ft

Estimated distance: 4km/2.5 miles

Final elevation: 4,600 m/15,091 ft

The trail from Karanga to Barafu reaches the bleak high desert of Kilimanjaro. Barafu Camp is a basic camp geared towards the business of reaching the summit.

barafu-camp
on-uhuru-peak-successful

Day 7: Barafu Camp (4,600m/15,091 ft) to The Summit (5,896 m/19,343 ft) and then to Mweka Camp (3,100 m/10,170 ft)

Summit time: 7 hrs

Elevation change: +1,300 m/+4,265 ft

Estimated distance: 5km/3.2 miles

Final elevation: 5,896 m/19,343 ft

Descent time: 5 hrs

Elevation change: -2,800 m/-9,186 ft

Estimated distance: 12km/7.5 miles

Final elevation: 3,100 m, 10,170 ft

This is a midnight ‘Alpine Summit’ to make sure we reach the summit by dawn, in time to return to Mweka Camp for the sake of improved.

Day 8: Mweka Hut (3,100 m/10,170 ft) to Mweka Gate (1,828 m/6,000 ft)

Descent time: 4 hrs

Elevation change: -1,250 m/-4,101 ft

Estimated distance: 10km/6.21

Final elevation: 1,828 m/6,000 ft

Today is a short walk towards Mweka Gate and pickup. It is a short day with arrival at the Gate at about 12:00 noon. checkout and return to Moshi.

Mweka Gate 1

What is included:

  • Airport transfers (to/from Kilimanjaro International Airport)

  • All park fees and mountain permits

  • Professional mountain guides, porters, and cook

  • Tents and camping gear (except sleeping bags, unless stated)

  • All meals and drinking water on the mountain

  • Accommodation before and after the climb (in Moshi or Arusha)

  • Rescue fees (for emergencies)

  • Fair wages for crew (as per KPAP standards)

What is excluded:

  • International flights

  • Tanzanian visa fees

  • Tips for guides, porters, and cook (expected but not included)

  • Personal trekking gear (sleeping bag, clothing, boots)

  • Travel insurance (mandatory for most operators)

  • Snacks, energy drinks, and bottled beverages

  • Extra hotel nights (before or after the trek, if needed)

  • Portable toilet (optional on some routes at extra cost)

Book This Tour