
8 Days Kilimanjaro Climb - Lemosho Route
Day 1: Lemosho Gate to Mti Mkumbwa (2,650 m/8,692 ft)
Hike time: 3hrs
Elevation Change: + 650 M/+2,132
Estimation distance: 10 km
Final Elevation: 2,650 m/8,694 ft
After a 1 1/2 hour drive from Moshi check in is at the Lemosho Gate. Day 1 is fairly easy with a 3/4 hour climb to Miti Mkubwa Camp.


Day 2: Mti Mkubwa (2,650 m/8,692 ft) to Shira One Camp (3,609 m/11,841 ft.)
Hike time: 5 – 6 hrs
Elevation change: + 950 M/+3116
Estimation distance: 12 km
Final Elevation: 3609 m/11,841 ft
A few hours walk will see the end of the forest and the beginning of a climb through heather forest to the edge of the Shira Caldera. Destination is the scenic Shira One Camp
Day 3: Shira One Camp (3,609 m/11,841 ft.) to Shira Two Camp (3,849 m/12,628 ft.)
Hike time: 5 – 6 hrs
Elevation change: + 240 M/+787 ft
Elevation distance: 5 km
Final elevation: 3849 m/12,628 ft
Today is spent on a gentle hike across the Shira Plateau with possible side trips to Shira Cathedral. Camp is at the first high camp of Shira Two.
NOTE: From Shira Two Camp the trail links with Machame Route.


Day 4: Shira Two Camp (3,849 m/12,628 ft.) to Barranco Hut (3,948 m/12,956 ft.)
Hike time: 5 hrs
Elevation change: +100 M/+328 ft
Estimated distance: 6 km
Final elevation: 3948 m/12,956 ft
The real work of climbing Kilimanjaro begins here. Today the main feature is a slow climb to Lava Camp followed by a descent to the beautiful Barranco Camp. This is the Climb-High-Sleep-Low principal of altitude adjustment.
Day 6: Karanga Valley (3,963 m/13,000 ft) to Barafu Hut (4,600 m/15,091 ft)
Hike time: 3.5 hrs
Elevation change: +600 m/+1,968 ft
Estimated distance: 4km/2.5 miles
Final elevation: 4,600 m/15,091 ft
The trail from Karanga to Barafu reaches the bleak high desert of Kilimanjaro. Barafu Camp is a basic camp geared towards the business of reaching the summit.


Day 7: Barafu Camp (4,600m/15,091 ft) to The Summit (5,896 m/19,343 ft) and then to Mweka Camp (3,100 m/10,170 ft)
Summit time: 7 hrs
Elevation change: +1,300 m/+4,265 ft
Estimated distance: 5km/3.2 miles
Final elevation: 5,896 m/19,343 ft
Descent time: 5 hrs
Elevation change: -2,800 m/-9,186 ft
Estimated distance: 12km/7.5 miles
Final elevation: 3,100 m, 10,170 ft
This is a midnight ‘Alpine Summit’ to make sure we reach the summit by dawn, in time to return to Mweka Camp for the sake of improved.
Day 8: Mweka Hut (3,100 m/10,170 ft) to Mweka Gate (1,828 m/6,000 ft)
Descent time: 4 hrs
Elevation change: -1,250 m/-4,101 ft
Estimated distance: 10km/6.21
Final elevation: 1,828 m/6,000 ft
Today is a short walk towards Mweka Gate and pickup. It is a short day with arrival at the Gate at about 12:00 noon. checkout and return to Moshi.

What is included:
Airport transfers (to/from Kilimanjaro International Airport)
All park fees and mountain permits
Professional mountain guides, porters, and cook
Tents and camping gear (except sleeping bags, unless stated)
All meals and drinking water on the mountain
Accommodation before and after the climb (in Moshi or Arusha)
Rescue fees (for emergencies)
Fair wages for crew (as per KPAP standards)
What is excluded:
International flights
Tanzanian visa fees
Tips for guides, porters, and cook (expected but not included)
Personal trekking gear (sleeping bag, clothing, boots)
Travel insurance (mandatory for most operators)
Snacks, energy drinks, and bottled beverages
Extra hotel nights (before or after the trek, if needed)
Portable toilet (optional on some routes at extra cost)